Changes in energyPRO 4.1.2.197

 

IMPROVEMENTS

-          Economy, payments. New German market function, “ManagementPr”(management premium)

 

ERRORS FIXED

-          Economy. Payment groups containing no payments cause error. Error introduced in version 4.1.2

-          Region. Production unit not producing at specific site at certain demand conditions fixed

-          Fuels. Occasional initialization problems fixed

 

Changes in energyPRO 4.1.2.192

 

IMPROVEMENTS

-          Economy, payments. New German market functions. Those are “MarktWert”(market value) and “FlexPr” (Flexibilitätsprämie or flexibility bonus)

 

ERRORS FIXED

-          Operation strategy. Tri-generation priority error, when user defined

-          Economy, payments. Error when double clicking a Payment group in graphical user mode and selecting OK on leave

-          Project identification. Only two lines in upper memo box are saved

 

 

Changes in energyPRO 4.1.2.188

 

ERRORS FIXED

-          Tri-generation priority error

-          Non availability periods crossing New Year fails

-          Reports. Division by zero error if no windows printer is defined on PC.

-          Demands, Error when demand stated as monthly values with time cycle

-          Calculations, if more years last month in each year contain on extra day

-          Demands, if weather dependent and sum of degree days is zero then distribution fail

-          Operation strategy, one month to much in month selector

-          Electricity markets.  If more markets established in a prior version calculation fail in some cases

-          Economy, main folder. IRR radio button settings not saved correctly

-          Operation strategy, not all time series having impact on operation strategy in actual month is represented as slider

 

Changes in energyPRO 4.1.2.178

 

ERRORS FIXED

-          Setup, Logo for reports, more logos supported

-          Operation strategy report. Missing start cost

-          Operation strategy. Misc tab. Only electricity producing/consuming units to be connected to el-market

-          Fuels, advanced. Problem pasting time series

-          Technical reports. Operational hours not calculated correctly in all cases

-          Minor corrections of user interface layout in some windows

-          Payments. Error when deleting fuel cause problem

-          Payments, advanced. Initialization problem fixed

-          Heat Demands, stated as time series. Possible problem in first day of calculation fixed 

 

Changes in energyPRO 4.1.2.172

 

IMPROVEMENTS

-          New MARKETS module. Now possible to model more Electricity wholesale markets in same project

-          Electricity market. Major changes to prognosis options.

-          Modernised user interface

-          Battery storage

-          Hydro storage improved

-          Modeling of Electrical cars

-          Solar collectors and PV. Array shading included

-          Project reports (subfolder to “Project identification”. Define Multiple report combination facility (create your own templates)

-          REGION, site can be imported from another project file

-          Financing and investments. Now possible to creating a loan or investment starting earlier than project start.

-          Report production, Graphic. New option to show time series. Market graphics (upper graph) substituted by production specific priorities

-          Graphical user mode. Quick access to “Site overview” and “Operation strategy” from toolbar

-          Computer Memory management improved

-          Time consumption during change between windows minimized

 

ERRORS FIXED

-          Investment, financing missing cash account impact first month fixed

-          Annual non availability problem (missing one day in some cases) fixed

-          Deleting more sites in graphical user mode return error

-          Help - Tutorials (online) link doesn't work.

-          Transmission in years following first year in not correct.

-          Assumption reports minor corrections and improvements.

-          Payments with time series fail in payments concerning using energy units operation time or number of starts.

-          Default search path for external conditions corrected

-          Operation strategy report, generation of report fails if fixed tariff market present in project

-          Error in payment when deleting fuel.

-          Existing projects with two wholesale markets (hereof one a flat tariff market) can be calculated without MARKETS license

-          Electricity market. Creating a new spot market, with rough or detailed prognosis cause an initial error when selecting "as graphics".

-          Economy payments. Formula does not reflect changes of production unit combo box

-          Operation Strategy. Minor visibility changes

-          Hydro pumping station, setting Operation restricted to period removes selected time series in water inlet

-          Minor translation corrections

-          Income statement annual. Accumulation of volume incorrect if time restriction set in payments (advanced)

 

 

Changes in energyPRO 4.1.1.131

ERRORS FIXED

-       Reports. First years transmissions are incorrectly used in all years.

-       Demands. Show as Graphics button is missing, if demand is shown as time series.

-       Operation strategy. If set to spot market (auto) and no energy units are set to “calculated” then an access violation error appears on show hint.

 

Changes in energyPRO 4.1.1.130

ERRORS FIXED

-       Economy. Nominal discount rate problem solved

-       Economy. Deselecting “Define annual key figures” problem

-       Project identification. Occasional “numeric error” changing project from DESIGN to OPERATION

-       Report, cash flow graphics, remaining dept not shown correctly’

-       Help file. Missing links fixed

-       Thermal store. Problem converting projects saved in older versions fixed 

 

IMPROVEMENT

-         New tutorials and How to on the EMD-homepage http://www.emd.dk/energyPRO.

 

Changes in energyPRO 4.1.1.124

ERRORS FIXED

-          Demands. Showing daily variations graphical, followed by demands shown as time series cause access violation.

-          Strategy. Empty priority in user defined strategy table cause error.

-          Energy conversion. Collating error occurs if more years are calculated and optimization period is set to one year.

-          Financing. Floating point error when selecting index or foreign loan (indexes present).

-          Economy. Error when using variable monthly prices and length of calculation step is deviating from one hour.

-          Economy. Semicolon in complex user defined payments might cause error.

-          Graphical user mode, zoom is not saved correctly.

-          Energy Calculation. Missing warning when electricity demand not met in island operation calculation.

-          Production graphic. Changing spot price chart colours in “Production, graphic” only changes the colours in the legend, whereas the graph keeps original colour.

-          Energy calculation. Min. Operation time not working correct when length of calculation step is deviating from one hour.

-          Heat blow off changed to heat rejection.   

 

Changes in energyPRO 4.1.1.111

 

ERRORS FIXED

-          Fuels. Changing offered fuel to time series gives visibility errors

-          Aggregation error. Occur if annual optimization is chosen in project identification and variable monthly values used in economy payments.

-          Hydro store. Problem with discontinued content of storage when changing month

-          Cash flow summary. Access violation problem.

-          Calculation problems if island operation is selected followed by that the last electricity demand is removed

-          Incorrect inclusion of start costs in the automatic operation strategy calculation  

 

IMPROVEMENT

-          Calculation speed improved (especially in projects with variable monthly values used in economy payments).

-          Production graphical. Improvement to electricity market graph

-          Operation module: csv (comma separated values) dump to file option 

 

Changes in energyPRO 4.1.1.54

ERRORS FIXED

-          Economy, ReceivedFuel payment is wrong when price per Unit used in time series

-          Operation module, Problem with setting start and end date fixed

 

IMPROVEMENT

-          Production Graphical, Automatic setting of lower value of left axis and name of used spot time series shown as legend

 

Changes in energyPRO 4.1.1.42

ERRORS FIXED

 

-          Fixed, PapFuel function was wrong

-          Time series, time series functions, demands as time series and fuel as time series: Problems with visibility and placement of windows elements fixed

-          Region, Missing electricity production in Energy conversion annual fixed

-          Wrong message, when trying to open an already open file

-          In time series function, the graphic in conversion table could have wrong axes.

-          Setting a unit to Low in selected priority, resulted in a wrong priority number

 

Changes in energyPRO 4.1.1.33

ERRORS FIXED

 

-          Heat blow off problems in the REGION module

-          Energy calculation annual report: electricity production missed

-          Solar collector. Problem with wrong variation over years

-          Operation strategy contain information of already deleted energy conversion units (Classic user mode)

-          Fuel store information stated as monthly values are not correctly converted to time series in the OPERATION module

-          Error in time series functions cause multiple error messages

-          Missing capacity on electric input in graphical user mode

-          Occasional problem with use of fuel store fixed

-          Economy in hydro pumping station not aggregated correct

-          Problem showing time series functions as graphics

-          Text in bottom collide with scroll bar

-          Conversion unit out of operation not always respected

-          Solar collector and PV problem with calculation of diffuse radiation

-          Update problem concerning demand stated as monthly values  

-          Hydro pumping station imbalance problems

-          Problem with more than one thermal store

    

 

IMPROVEMENTS

-          Economy: Time series now available in economy.

-          Economy: Energy conversion now available in economy as time series

-          Economy: Energy conversion capacities now available in economy

-          External condition: External conditions in economy moved to external conditions in technical section and economy main folder

-          External condition: Time series, time series functions and indexes are now singled out as separate folders under main folder

-          External condition: Holidays available for more countries

-          Project identification/ Time series: Warning when time series are more detailed than calculation steps

-          Check for energyPRO updates

-          Option for customer logo in reports

-          Electricity market: Electricity market(s) now defined in subfolder(s) to Electricity market main folder

-          Stores: Stores are singled out from energy conversion unit in its own folder

-          Stores: Cold store available

-          Improved heat blow off calculation

-          Operation strategy: Cooling costs are now calculated in the automatic operation strategy calculation

-          Improved tri-generation calculation

-          Operation strategy: Cooling and energy unit setup are singled out on separate tab sheets   

 

 

Changes in energyPRO 4.0.2.164

ERRORS FIXED

-          Operation strategy. Blow off setting save problem fixed

-          Energy Units. Blow off problem in region module fixed

-          Energy Units. Thermal store loss calculation with more stores fixed

-          Energy Units. Problem filling hydro pumping station fixed 

-          Energy Units. Solar collector/PV time series update problem fixed

 

 

Changes in energyPRO 4.0.2.158

ERRORS FIXED

-          Energy Units. Missing production on wind power, when hydro pumping station

-          Energy Units. Calculation error in some cases without access to thermal store

-          Energy Units. Heat blow off problem fixed

-          Demands. Save error when data specified with as monthly values fixed and subsequently changed in annual demand

 

 

Changes in energyPRO 4.0.2.152

ERRORS FIXED

-          Energy Units. Photovoltaic reflection part is missing

-          Energy Units. Solar collector. Reflection part is slighted overestimated

-          Region module, Calculations. Possible calculation problems with more than two sites

 

 

Changes in energyPRO 4.0.2.138

ERRORS FIXED

-          Fuels, conversion from monthly values to time series in operation calculation fixed

-          Fuel storage, CHP does not always draw fuel from storage problem fixed

-          Energy units, electricity consumption wrong in heat pumps and electric chillers with more loadcurves

-          Energy units, Deleted unit occur in strategy after being deleted   

 

 

Changes in energyPRO 4.0.2.128

ERRORS FIXED

-          Energy conversion. Fixed missing CHP-production calculation problem in projects with small thermal stores

 

Changes in energyPRO 4.0.2.125

ERRORS FIXED

-          Error when loading project in graphical user mode fixed

-          Economy. Define annual key figure. Crash error fixed (graphical user mode)

-          Electricity markets. Update of period definition table Crash error fixed.

-          Operation strategy. Error when changing market in misc. table fixed (User defined strategy)

-          Energy Units. Non availability problem fixed.

-          Project identification. Repeated warnings removed

-          Marking more units in graphical window only works from right and downwards

-          Hydro pumping station doesn't operate as expected. misses full load on wind turbine in some situations

-          Error in about, when having time limited registration file.

-          Graphical user mode, zoom is not saved correctly 

 

 

Changes in energyPRO 4.0.2.112

ERRORS FIXED

 

-          Duration curve show order corrected

-          Energy units. Annual non availability problem when working with projects not following the calendar year, fixed

-          Cash flow summary report, index out of range problem fixed

-          Electricity markets. Deleting intervals in priority names is fixed (user defined projects)

-          Fuels. Fuels advanced, problem with converting month values to time series fixed

-          External conditions. Missing graphics when pressing show as graphic button is pressed 

-          External conditions. Time series function missing after having been shown as graphics is fixed 

-          Economy. Error using Index(“time series”) fixed (Problem was introduced in version 4.0.1.79)

-          Economy. Test button not functioning in user defined payments is fixed

-          Calculations. Unexpected “Demand not met” message problem is fixed

-          Energy conversion report. Formatting problem is fixed 

IMROVEMENTS

-          MAJOR CHANGE. New calculation engine introduced, substitute the old one

-          MAJOR CHANGE. Region module is updated

-          Zoom an online data import improved

-          Energy units. Modeling of thermal stores is improved

-          Windows 10 adaption

-          Operation strategy. Graphics is improved (Automatic operation strategy - spot market) 

 

Changes in energyPRO 4.0.1.79

ERRORS FIXED

 

-          Demand, changing monthly do not set flag for new calculation needed

-          Payment functions, error handling problem fixed

-          Problem with unnecessary recalculations fixed

-          Out of memory problem fixed

 

Changes in energyPRO 4.0.1.64

ERRORS FIXED

 

-          Heat blow off “Allowed only end NHPC negative” not saved problem fixed. 

-          Occasional file opening problem fixed.

-          Saving Investment problem fixed

-          Demand Symbol is changed when switching between a demand and a time series

-          Problem with error in graphic connections fixed

-          Marking more units in graphical window only works from right and downwards

 

IMPROVEMENTS

-          Visual appearance of formula fields harmonized.

-          NCAR data importer improved

-          Initialisation of demands changed  

 

Changes in energyPRO 4.0.1.40

ERRORS FIXED

 

-          Economy. Deleting Energy production units causes functional problems with payments. Error handling. 

-          Economy. Problem with retaining correct fuel in economy payment lines fixed.

-          Catalogue of economical assumptions. Range check error when investments when grants present in project

-          Activation problem concerning activation of Lithuanian version fixed

IMPROVEMENTS

-          Lithuanian language module updated.

-          Error handling. Option to send error file when energyPRO encounter errors

-          Error handling in payment lines improved

 

Changes in energyPRO 4.0.1.29

ERRORS FIXED

-          Problem with reactivation, when already activated fixed

-          Problem with registration, when using outdated registration file fixed

 

Changes in energyPRO 4.0.1.22

IMPROVEMENTS

-          A major improvement is the new visual editing interface. Two modes are introduced. Classic mode and Graphical user mode.

-          Financing. Grants, deferred income introduced (Accounts module)

-          New license activation system

-          Trading on two electricity markets(energy), having access to flat rate tariff when spot market or fixed tariff is selected  

ERRORS FIXED

-          Date conversion error in holidays fixed

-          Production graphical report, Copy to clipboard problem is fixed

-          Demand as timeseries problem fixed

-          Demand wizard error status problem fixed

-          Operation strategy, Combination problem with calculated operation strategy when heat blow off is present and region module is selected, problem fixed

-          Operation strategy. Problem setting, in operation from beginning in operation module is fixed

-          Operation strategy. Corrections in miscellaneous table

-          Index. Copy all/paste error is fixed

-          Index. Bottom axis problem (starts in year 1900) problem is fixed

-          Economy. function “1/DeliveredElectricity” report error even when DeliveredElectricity is > 0, problem fixed    

 

Changes in energyPRO 3.4.3.5

IMPROVEMENTS

-          Operation strategy, Blow off table. Table changed if Automatic calculated operation strategy and electricity market is spot marked

-          Operation strategy, Miscellaneous table. Option to overrule automatic calculated operation strategy is implemented

-          Project name in Windows taskbar  

ERRORS FIXED

-          Economy, Error in heat blow off function fixed

-          Warning if demand not meet improved

-          Production graphic. Mouse right click give access to editing actual graph and not just top graph

-          Energy unit solar panel K-theta at 50 degrees now saved.

-          Problem with missing forced recalculation of energy conversions when indexes and time series are changed is fixed

-          Operation strategy. Problem that values in priority of production table is not saved if the production unit has formulas in power curve is fixed

-          Textual corrections made

-          Loading demands. Problem with duplicated symbols is fixed

-          External conditions, manual defined holidays. Problem with US date-time formats fixed

-          Save as routine now always suggest actual project saved in the same path from where it was loaded

-          Change of fuel in energy unit does automatically change the function HeatValue(Fuel) in economy, corrected

-          Use of index in demands. Problem with one day delay of index fixed

-          Demands Use of index and restricted period values not saved if demand was entered as time series, fixed    

 

 

Changes in energyPRO 3.4.2.38

IMPROVEMENTS

-          Wind farm added as specialised production unit

-          Export to clipboard facility in reports added for all Reports containing tables (tab separated)

-          Internal Rate of return. Annual option added.

-          Warning when demands are not met is implemented

-          Production units are calculated in reverse chronological order IF 1) the unit has heat production, 2) no access to thermal store 3) same production price in all hours (all three constraints must be met) 

ERRORS FIXED

-          Operation module error fixed. Wrong collation of monthly values If calculation period starts inside a month and the planning period exceed a month shift.

-          Problems pasting data to tables if windows list separator is equal windows decimal separator or windows thousand separator

-          Correction of Automatic operation strategy calculation when one production unit only

-          Correction of Automatic operation strategy calculation when production unit is referring to external time series

 

Changes in energyPRO 3.4.1.16

IMPROVEMENTS

-          Weather data importer introduced (Globe)

-          Calculation speed increased.

-          German language module updated

-          Electricity Exchange included in copy to clipboard

-          Productions now available in all duration curves

ERRORS FIXED

-          Photo Voltaic and solar panels (annual non availability problem fixed)

-          Status window hanging problem fixed.

-          Occasional “index out of range” problem fixed when collating energy productions automatic operation strategy on spot market

-          Automatic operation strategy calculation problem fixed  

 

Changes in energyPRO 3.4.0.19

 

IMPROVEMENTS

-          Manual/online help updated

 

ERRORS FIXED

-          Correction concerning indexing of time series (error introduced in 3.4.0.5)

-          Occasional error interpreting spot market payments in economy fixed

-          Correction of generated demands (error introduced in 3.4.0.5)

-          Imbalance between heat demand and heat production in some situations (error introduced in 3.4.0.5)

 

Changes in energyPRO 3.4.0.5

IMPROVEMENTS

-          Solar Collectors as production units

-          Photovoltaic as production unit

-          Minor changes in menus and texts

-          Automatic operation strategy calculation also when electricity market is “No market” of “Flat rate”

-          Automatic operation strategy calculation when using formulas in load curves improved

-          Automatic check of data integrity improved

-          Production on production units with no access to thermal store is placed reversed chronological

ERRORS FIXED

-          Minor correction in extending time series

-          Automatic check of data integrity problems fixed

 

Changes in energyPRO 3.3.0.21

ERRORS FIXED

-          Problem with automatic operation strategy calculation when calculating more years fixed, Error introduced in version 3.3.0.19.

 

Changes in energyPRO 3.3.0.20

ERRORS FIXED

-          Problems with automatic spot market calculation when zero values in heat production load curves fixed. Error messages and graphical representation

 

Changes in energyPRO 3.3.0.19

ERRORS FIXED

-          Program flickering at start removed

-          Errors when calculating automatic operation strategy removed

-          Graphic error in operation module fixed (displaced tariff periods)

-          EnergyPRO calculation engine corrected. Situations with overflow of thermal store removed.

-          Error when distributing demand entered as monthly values fixed  

IMPROVEMENTS:

-          Possibility of automatic calculation of operation strategy when using formulas in load curves

-          Tool for calculating solar radiation at inclined plane introduced

-          Boiler production when access to storage changed (less restricted than before)

-          Better monthly transitions, when using automatic calculated operation strategy 

 

Changes in energyPRO 3.3.0.17 and 3.3.0.18

ERRORS FIXED

-          When power curve input is changed from number to formulas the power curve units are automatic set to MW 

-          Revenues from electricity spot sale may be lost when changing the order of energy production units appearance in the folder structure. Problem is fixed

-          Graphic views of time series and time series functions are occasionally unavailable. Problem is fixed

-          Demand: When entered/edited as monthly values the active field is not registered. Problem is fixed

-          Correspondence problems between changes in power curve type (Formula/not formula), Electricity market and operation Strategy. Problems seen as “access violations” and/or “index out of range messages”. Problem is fixed.

 

IMPROVEMENTS:

-          Test button functionality when checking functions/formulas in time series functions, power curves and economy payments is improved

-          Minor changes in various reports

   

Changes in energyPRO 3.3.0.16

ERRORS FIXED

-          Occasional index out of range error when generating economic reports in finance module fixed

-          Wrong interpretation of amount energy demand if not stated in MWh fixed. Error introduced in 3.3.0.14

-          Restricted period of connection in demand changed to correspond with restricted periods elsewhere in energyPRO. Both months stated is included in calculation.

-          When to recalculate the energy conversion is fixed.         

 

Changes in energyPRO 3.3.0.15

ERRORS FIXED

-          Error when reading Operation strategy is fixed (error introduced in 3.3.0.14)

 

Changes in energyPRO 3.3.0.14

 

IMPROVEMENTS

-          Annual optimization of productions reintroduced when user defined operations strategy

-          Remodelling of demand calculation/distribution, including an improved modelling of “Fixed profile of demand”

-          Auto calculation optimized

-          Heatblowoff function added to economy

-          Graphic reports speeded up

-          Graphic update of electricity markets and operation strategy if spot market is auto calculated improved

-          Monthly calculation (concerning day one after shift of months) improved

-          Demand: Modelling of “Fixed profile of demand” improved

-          ProcessHeatConsumption powercurve added to production unit(to invoke this option choose “advanced” and check “transmission of heat from…” in the “Project identification” window 

 

ERRORS FIXED

-          Graphical inconsistency between timeseries and demands as timeseries windows fixed

-          Calculation if needed and ONLY if needed fixed

-          Region module Demands not shown correct in reports fixed

-          Occasional incorrect setting of module, when reading loading a new project (of another project is already loaded) fixed

 

Changes in energyPRO 3.3.0.13

 

IMPROVEMENTS

-          Check for Zero values in indexes used to modify time series. Zero values in index is not allowed within the start and end time of the original time series (external condition or demands). Invalid values invoke a red cross in the folder structure.

 

ERROR CORRECTIONS

-          Error when transferring specified demand with fixed profile of demand to the whole planning period fixed

-          Error with restricted period of connection fixed   

-          Visibility problem with disappearing formula in time series function fixed.

-          Problem with no values on Left axis on graphs if max values are small fixed.

 

Changes in energyPRO 3.3.0.12

 

IMPROVEMENTS

-          Export of reports into different formats (including MS Excel) via external freeware ESBRaveViewer.

-          Comment fields added to all editing windows

-          Process heat Production (PHP) and Process heat Demand  (PHD) available in defining economy.

 

ERROR CORRECTIONS

-          Access violation when toggling between different tariff option removed

-          Show as graphics problems visibility problems fixed

-          Time series function. Problem with occasional invisible formula field fixed

-          Electricity market initialization problem with defining periods fixed,

-          Electricity market problem with market type spot market(auto) combined with no prognosis fixed

 

Changes in energyPRO 3.3.0.11

 

ERROR CORRECTIONS

  - lower buttons on electricity markets window recovered

 

Changes in energyPRO 3.3.0.10

 

ERROR CORRECTIONS

  - Problem with time series not following index in external condition fixed

 

 

Changes in energyPRO 3.3.0.9

 

ERROR CORRECTIONS

-          Red crosses on some economy folders when loading project even if ok. Error fixed.

-          Error in demand using timeseries symbol different from first symbol in list removed.

-          Unintentional auto calculation of operation strategy if user defined operation strategy causing errors removed

-          Fix of error when pasting timeseries into energyPRO

-          Economy: calculation of QI (quality index) in annual key figures.

-          Stability problems when switching between user defined and auto calculated operation strategy fixed

-          Initialization problems when establishing new projects with, either no electricity market or with flat rate market, is fixed.

-            

Changes in energyPRO 3.3.0.8

 

IMPROVEMENTS

-          Indexes now available for modifying time series.

-          Quicker handling of demands. Moving of demand from specified year to other years in planning period is slightly changed. In now a strict copy of the specified year under subject to weekly conservation of demands.  

 

Changes in energyPRO 3.3.0.7

 

ERROR CORRECTIONS

-          Electricity market. Lack of updating priority table when “Operation Strategy” is “auto calculated” is fixed. Visibility problem with fixed priority table when “Electricity market” is “auto calculated” is fixed.

-          Warning dialog when trying to read an already open file or write protected file is corrected (does now include the possibility that the file is write protected)

 

OTHERS

-          Swedish and Estonian language no more supported

 

Changes in energyPRO 3.3.0.6

 

ERROR CORRECTION

  - Occasional Access violation in energy calculation, if Electricity market is “No Market” or “Flat Rate”, fixed.

IMPROVEMENTS

 

 

Changes in energyPRO 3.3.0.5

 

ERROR CORRECTIONS

-          High time consumption switching from “electricity market” to “operation strategy” if “electricity market” is “spot market” and auto calculated

-          Access violation if only one priority period if electricity market is spot market fixed.

-          Formula test in economy – define annual key figures is fixed.

-          Error when switching “auto calculated” to “user defined” if “electricity market” is “spot market” is fixed.

-          Main Header label corrected in “Operation Strategy” priority table.  

 

IMPROVEMENTS

-          Manual/online-help updated to reflect changes from version 3.2.x.x to 3.3.x.x

-          Modified Y-axis in “electricity market” shown as graphics is saved also used in report “Production, graphical” and visa versa

-          Warning if change of selected energyPRO module will cause loss of data.

 

Changes in energyPRO 3.3.0.4

 

ERROR CORRECTIONS

-          Problem with tariff periods not saved if operation strategy is auto calculated (fixed tariffs) fixed.

-          Unused columns in lower table in “Electricity market” removed

-          Error when selecting “show graphics” if no time series selected (electricity market = spot market) fixed

-          Occasional error when closing energyPRO (access violation) fixed, 

 

Changes in energyPRO 3.3.0.3

 

ERROR CORRECTIONS

 - Visibility problem with priority/NPHC table in Operation strategy window fixed.

 

Changes in energyPRO 3.3.0.2

 

ERROR CORRECTIONS

-Operation strategy, automatic calculating strategies. Error when not choosing first month in combobox.

-Report “Catalogue of technical assumptions”. Formulas used in load curves in fixed.

-Time series conversion problems introduced in version 3.3.0.0 fixed

 

IMPROVEMENTS

-Automatic calculation of operation strategies introduced for spot market optimization

-Report “Operation Strategy Calculation” revised. 

-Report “Catalogue of technical assumptions”. Formulas used in load curves in fixed.

 

See description of Automatic calculation of operation strategy facilities in

EnergyPRO 3.3 Introduction

 

Changes in energyPRO 3.3.0.0

 

ERROR CORRECTIONS

 

 

IMPROVEMENTS

-Automatic calculation of operation strategies introduced for fixed tariffs

-Monthly optimization instead of yearly optimization 

-Report Operation strategy calculation added. Report is visible when operation strategy is “Minimizing net heat production”